Choosing a skip bin size is the question we get asked most, and getting it right the first time is the single easiest way to keep the cost down. A second delivery always costs more than sizing up at the start.
Start with the trailer rule
The quickest way to picture a cubic metre is this: one cubic metre is roughly one 6×4 trailer load. So a 2m³ bin is about two trailer loads, and a 9m³ is about nine.
The sizes
2m³ (1.9m × 1.6m × 0.9m) suits soil, rubble, rock and concrete, or a small household clean-up where space is tight.
3m³ (2.4m × 1.6m × 0.9m) handles a small bathroom renovation or a clean-up around the house and garden.
4m³ (3.0m × 1.6m × 0.9m) is the workhorse for larger bathroom and kitchen renovations.
6m³ (3.7m × 1.6m × 1.25m) steps up to work-site clean-ups and cyclone preparation.
9m³ (4.2m × 1.8m × 1.5m) is the big one, for very large clean-outs and ongoing site work.
We also run 8m³ and 15m³ bins in limited supply, available on 1 to 7 day hire.
Most of our bins are walk-in
Most of our bins open on the short end, so you can walk large items like couches and whitegoods straight in, or push a wheelbarrow in and tip it out.
Two things that catch people out
First, weight allowances vary by size and waste type. A 4m³ bin allows 1 tonne of building waste but 600 kg of household waste. Second, bins fill to the top rail and no higher.
Not sure? See the full skip bin sizes page or request a quote.